Last-mile 1Z0-1123-25 review: migration phases, connectivity pickers (VPN/FastConnect), cutover decision tables, validation checklist, and rollback planning.
Use this for last‑mile review. Pair it with the Syllabus.
Assess → design landing zone → migrate data → migrate apps → validate → cut over → stabilize.
High-yield reminders:
| Requirement | Prefer |
|---|---|
| Fast setup / lower cost | IPSec VPN |
| Higher bandwidth / predictable latency | FastConnect |
| Multiple VCN routing hub | DRG-based hub |
| Constraint | Prefer |
|---|---|
| Can tolerate downtime | offline cutover (simpler) |
| Minimal downtime | online migration/replication + controlled switchover |
Always include: